How to avoid five ready mix concrete mistakes

Concrete has many practical advantages if it is mixed and poured properly. Even small mistakes can dangerously compromise its integrity and be costly to fix. When you purchase concrete Swindon, make sure you plan in advance to avoid these common errors.

Ordering the wrong grade

Using the wrong concrete grade could cause cracking. Check the relevant building regulations, confirm with your supplier and match the grade with both a class and exposure class before ordering.

Poor sub-base preparation

A poor sub-base could slowly collapse. It is vital that the sub-base has a uniform depth. Use mechanical compaction on the hardcore, ensure adequate drainage, and fit a damp-proof membrane where appropriate.

Failure to account for delivery time

Ensure you have access to the site, appropriate tools and have scheduled the labour before ordering the mix, otherwise delays risk weakening the concrete and making it less workable.

Adding too much water

Adding too much water risks weakening the concrete. Use plasticisers instead of water to make the mix more workable, order the correct slump level, follow instructions from suppliers such as https://www.monstermixconcrete.co.uk/concrete-swindon, and use professionally approved volumetric mixers.

Skipping or rushing the curing process

Keep the surface damp, cover it, utilise appropriate curing compounds and do not place anything else on the surface for at least a week, preferably a month, to ensure it cures and hardens properly.

Once you have a better knowledge of these common errors, you will hopefully be able to avoid making similar mistakes, and will ensure your project is successful and on time.

Share this post on…

Related Posts